电缆桥架安装存在的问题
一、电缆桥架的拖臂一般是在桥架厂家用焊接的方式实现,当前寸土寸金的时代,这样就造成焊接好的桥架存储占用大量的面积,无形中提高
了电缆桥架成本,并且在运输、搬运过程中容易造成损坏。
二、电缆桥架是成套在电缆桥架厂家国定好的,虽然之前已经在现场测量计算了,但如果在现场发现有误差或者施工有变化就很容易造成电缆
桥架的浪费。同时如果因为返厂重做,既增大电缆桥架成本,同时也耽误施工工期,造成经济损失。
三、临时修改电缆桥架的制作。破坏了整体桥架的整体性,既不美观,质量有所下降。
Problems existing in the installation of cable bridge
First, the towing arm of the cable bridge is usually realized in the way of household welding in the bridge plant. At present, the time of the inch of the earth is gold, which causes the storage of the welded bridge to occupy a large amount of area, and it can be improved invisibly.
The cost of cable tray is easy to cause damage during transportation and transportation.
Two. The cable bridge is set in the factory of the cable bridge, although it has been measured in the field before, but it is easy to cause the cable to cause the cable if there is an error in the field or the change in the construction.
The waste of the bridge. At the same time, if the factory is rebuilt, it will not only increase the cost of the cable tray, but also delay the construction period, resulting in economic losses.
Three. Temporarily amend the production of cable bridge. The integrity of the whole bridge is destroyed, which is neither beautiful nor quality.